- Malibu Environmental Report Archives
Environmental Documents before 1/1/14
-
Pre-Cleaning Testing Report (raw data) – 12/31/13
Timeline for Malibu HS Cleaning and Testing – 12/20/13
EPA Acceptance with Conditions Letter - 12/20/13
Pre & post BMP Air Sampling Testing Plan - December 2013
Malibu High School Cleaning and Verification Sampling - December 2013
Letter from EPA Region 9 - PCBs in Malibu High School - 11/21/13
Media Statement RE: Preliminary PCB Testing Data – November 2013
Summary of PCB Results – November 2013
PCB Testing Locations (Tables 1, 2, & 3) - November 2013
Map of Malibu HS campus
PCB Air Lab Report (raw data) – November 2013
PCB Bulk Lab Report 8162 (raw data) – November 2013
PCB Bulk Lab Report 8163 (raw data) – November 2013
PCB Wipe Lab Report 8155 (raw data) – November 2013
PCB Wipe Lab Report 8156 (raw data) – November 2013
PCB Wipe Lab Report 8157 (raw data) – November 2013
Radon & EMF Report
Summary of Radon & EMF Results – November 2013
Asbestos Inspection Reports
AHERA 3 Year Re-Inspection Report - Cabrillo Elem. School - 6/11/13
AHERA 3 Year Re-Inspection Report - Malibu High School - 6/11/13
Mold Testing Report
Industrial Hygiene Survey Report – 10/17/13
Soil Testing Reports
Removal Action Completion Report (PCBs) – 6/12/12
Removal Action Completion Report Appendices A-E (PCBs) – 6/12/12
Removal Action Completion Workplan (PCBs) – 8/5/10
FINAL EIR – 1/19/12
Notice of Completion of the Final Environmental Impact Report
Please note that these Draft EIR documents became the Final EIR documents, with the exception of the revisions noted in Volume 5.
Volume 1 Final EIR - 1/19/12
Volume 2 Final EIR - 1/19/12
Volume 3 Final EIR - 1/19/12
Volume 4 Final EIR - 1/19/12
Volume 5 Final EIR - 1/19/12
DRAFT EIR – 7/21/11
Notice of Avaiiabilty Draft Environmental Impact Report
Volume 1 Draft EIR - 1/12/11
Volume 2 Draft EIR - 1/12/11
Volume 3 Draft EIR - 1/12/11
Volume 4 Draft EIR - 1/12/11
Initial EIR
EIR Scope Project Presentation - 12/15/08
EIR Scope Project
Initial EIR Report - September 2008
Lead-Based Paint Survey
Lead-Based Paint Survey - 8/14/06
Malibu High School ATC Hazardous Materials Survey
MHS ACT Materials Survey – 6/9/09
Underground Storage Tank (UST) Removal
TTMS, Inc.: Removal of USTs – August 1992
Earth Systems: Report of Additional Sit Assessment Activities – 2/8/93
Cape Env: Excavation Site Reconstruction Program – 2/18/93
Ocean Blue: Additional Data RE: Water Depth – 8/4/93
Vector Three: Interim Report Groundwater Monitoring Well Installation – 12/7/95
Reynolds Group: Groundwater Monitoring Report – January 1996
Reynolds Group: Groundwater Monitoring Report – April 1996
Reynolds Group: Groundwater Monitoring Report – July 1996
Ocean Blue: Summary Report & Closure Request – 8/21/96
Letter RE: UST Closure – 9/11/96
Ocean Blue: Destruction of Groundwater Monitoring Wells – 11/6/96
SMMUSD Information Updates before 1/1/14
Malibu Schools Environmental Update Correction/Clarification – 12/20/13
Letter to MHS & Cabrillo Staff & Parents - 12/20/13
Summary of 12/12/13 Board of Education Study Session - 12/13/13
Update on Environmental Testing - 11/22/13
Update on Environmental Testing (Spanish) - 11/22/13
PCB Air Sample Update - 11/18/13
Cabrillo Elementary School Community Meeting - 11/14/13
Update on Malibu Schools Environmental Task Force - 10/31/13
Malibu High School Community Meeting - 10/24/13
The Malibu Environmental Task Force Held Its Second Meeting - 10/24/13
The Malibu Environmental Task Force Held Its First Meeting - 10/17/13
Preliminary Mold Test Results Released and Next Steps Identified - 10/11/13
Update on the Malibu High School Environmental Testing Action Plan & Timeline - 10/11/13