Progress at JAMS PAC
Posted by Kelcey Davis on 1/15/2021 8:00:00 AM
Performing Arts Center
When complete, the center, a joint project with Santa Monica College, will house a 750-seat theater, dedicated rehearsal space, choir room and more.
Progress continues on the stage and seating area and on both levels of the building and back of building. Taping fo interior walls and ceilings, two restrooms are having tile work and fixtures installed.
Painting and structual work is complted on the catwalk level.
Rehersal Building
Scaffolding has been erected around the exterior of the rehersal building.
Sitewide
Sitewide, all utlities have been installed including gas, fire water, domestic water, sewer and storm drains.