Interior of JAMS PAC and Rehearsal Building is coming along.

Posted by Kelcey Davis on 2/9/2021 8:00:00 AM

The stage and seating area is seeing great progress as the stage lift structure and theatrical rigging system installation are underway. 

Slab poured in JAMS PAC.  

At the lobby and front of house, the slab-on-grade was poured on February 2nd.

Taping and scaffolding of JAMS PAC.

Scaffolding and taping of the auditorium sidewalls is underway. 

 JAMS PAC looking towards stage with scaffolding.

 Next up is othe panting f the auditorium interior, which will allow f the start of installing Audio-Visual devices. 

 

Track lights being installed at the RH building at JAMS PAC.

Track lights at the rehearsal building are being installed.